top of page
ARCHITECTURAL DESIGN V
PROJECT: PROPOSED GYM AND RESTAURANT

For this project we were put into teams of 2. One architecture student and one construction management student. The site assigned to our team was located at 655 Hill St, Glen Cove, NY. The site is 9.25 acres. 

Project Outline

A 3,500 SF Drive-thru restaurant and gym/fitness club (Sf to be determined for maximum yield) with a minimum of 2 outdoor tennis courts and 1 basketball court. Additional outdoor areas may be added such as a handball court.

 

The primary tasks to develop your project proposal are shown on the course schedule and include, site analysis, development of a preliminary proposal to include a building code analysis, the summary of the scope of the program, a design budget, and a work breakdown structure. Drawings, spreadsheets, report and digital presentation will be submitted.

 

Upon acceptance of the preliminary proposal, the team will develop a formal proposal base on design-build delivery which will include a set of proposal drawings defining the general, architectural, structural, and site work for the projects; a detail scope of work coordinated with a formal scope of proposal, an assembly-based estimate, and a detailed project management schedule for formal presentation to the developer.

Attached below is a pdf file of the set of proposed drawings.

bottom of page